Langley, BC
Terrace Residential Community
18-acre multi-phase hillside neighborhood requiring staged bulk excavation, preload removal, and precise benching for stepped foundations.
Scope: 150,000 m³ of excavation with detailed bench cuts and preload export Year: 2024
Gallery
In the field
Highlights captured while DSM delivered this scope.
Ready to mobilize
Speak with DSM’s estimating team
Call 604 372 4310 or send us the project package.