Skip to content
DSM Group logo
Menu

Langley, BC

Terrace Residential Community

18-acre multi-phase hillside neighborhood requiring staged bulk excavation, preload removal, and precise benching for stepped foundations.

Scope: 150,000 m³ of excavation with detailed bench cuts and preload export Year: 2024
DSM crews preparing hillside residential terraces.

Gallery

In the field

Highlights captured while DSM delivered this scope.

Benched slopes graded for retaining wall installation.
Benched slopes graded for retaining wall installation.
Servicing corridor compacted for utilities.
Servicing corridor compacted for utilities.

Ready to mobilize

Speak with DSM’s estimating team

Call 604 372 4310 or send us the project package.